Challenges and Solutions in the Commissioning of High-Voltage Power Transformer
Gayatri Singh
, Sapana Mahajan , Yogesh Manekar
Keywords: Pre-commissioning, transformer, kVA, 11,000/433V, oil leaks, insulation, temperature alarms, ratio test, magnetic balance, charging, no-load, air release, electrical grid, safety, performance.
Abstract—This document serves as a pre-commissioning test report for a transformer with a rating of [KVA] and a voltage ratio of 11,000/433 V. It provides a comprehensive overview of the various tests conducted to ensure the transformer's readiness for operation. The tests included checks for oil leaks, air release, insulation resistance, temperature alarms, and trips, as well as ratio and magnetic balance tests. Additionally, the report outlines the process of clearing the transformer for charging. The transformer was successfully charged on a specified date and time and was initially kept on no-load before being fully integrated into the system. This paper highlights the adherence to standard testing procedures, ensuring the reliable and safe operation of the transformer.
"Challenges and Solutions in the Commissioning of High-Voltage Power Transformer", IJSDR - International Journal of Scientific Development and Research (www.IJSDR.org), ISSN:2455-2631, Vol.9, Issue 11, page no.445 - 450, November-2024, Available :https://ijsdr.org/papers/IJSDR2411057.pdf
Volume 9
Issue 11,
November-2024
Pages : 445 - 450
Paper Reg. ID: IJSDR_212740
Published Paper Id: IJSDR2411057
Downloads: 000346998
Research Area: Engineering
Country: SHAJAPUR, M.P, India
ISSN: 2455-2631 | IMPACT FACTOR: 9.15 Calculated By Google Scholar | ESTD YEAR: 2016
An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 9.15 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator
Publisher: IJSDR(IJ Publication) Janvi Wave