Paper Title

Minimizing Production Time and Worker Fatigue: A Bi-Objective Mathematical Formulation for Job Scheduling

Authors

Vishal Kumar , Sumit Kumar , Shashi Bhushan Kumar , Md. Shahjahan Kamal

Keywords

ergonomic scheduling; human-centered manufacturing; mixed-integer linear programming; multi objective optimization; parallel machines; synthetic case study; workload allocation

Abstract

Production schedules that minimize completion time can concentrate physically demanding tasks on individual workers. This study presents a small bi-objective mixed-integer linear programming model that balances makespan and cumulative ergonomic exposure in manual job assignment. The model is demonstrated using an explicitly synthetic instance comprising five independent jobs and three identical workers. Each job has a processing time and an illustrative exposure score on a 1-10 scale. The formulation minimizes normalized makespan and the maximum cumulative exposure assigned to any worker. All 3^5=243 possible assignments were enumerated, which provides an exact check for this small instance and makes the results independently reproducible without a proprietary solver. The time-only solution achieved a makespan of 4.5 h and a peak exposure of 14 points. With equal normalized weights, the selected solution increased makespan to 5.5 h but reduced peak exposure to 10 points, corresponding to changes of +22.2% and -28.6%, respectively. Four nondominated solutions formed the Pareto frontier: (4.5 h, 14), (5.0 h, 12), (5.5 h, 10), and (6.5 h, 9). The results demonstrate the mathematical trade-off between production efficiency and exposure balance but do not establish a reduction in fatigue, injury, or cost because the input scores are hypothetical and not biomechanically validated. The formulation is intended as a reproducible proof of concept that can later be calibrated with observational assessment, wearable sensing, or plant-specific exposure data.

How To Cite

"Minimizing Production Time and Worker Fatigue: A Bi-Objective Mathematical Formulation for Job Scheduling", IJSDR - International Journal of Scientific Development and Research (www.IJSDR.org), ISSN:2455-2631, Vol.8, Issue 10, page no.981-993, October-2023, Available :https://ijsdr.org/papers/IJSDR2310152.pdf

Issue

Volume 8 Issue 10, October-2023

Pages : 981-993

Other Publication Details

Paper Reg. ID: IJSDR_311712

Published Paper Id: IJSDR2310152

Downloads: 000111

Research Area: Science and Technology

Country: -, -, India

Published Paper PDF: https://ijsdr.org/papers/IJSDR2310152

Published Paper URL: https://ijsdr.org/viewpaperforall?paper=IJSDR2310152

About Publisher

ISSN: 2455-2631 | IMPACT FACTOR: 9.15 Calculated By Google Scholar | ESTD YEAR: 2016

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 9.15 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Publisher: IJSDR(IJ Publication) Janvi Wave

Article Preview

academia
publon
sematicscholar
googlescholar
scholar9
UGC Care
maceadmic
Microsoft_Academic_Search_Logo
elsevier
researchgate
ssrn
mendeley
Crossref
orcid
sitecreex