Analysis of Cost & Schedule Overrun in Construction Projects
Prof. Pranay Khare
, Pravin Waykar , Sanket Padir , Amit Kamble , Prathamesh Rasal
The aim of the present study was to investigate the increasing frequency of cost and time overruns on construction projects, and to provide recommendations for addressing the situation.Identification of the distribution and trends of the cost overruns and time delays of contracts.Analyses for identifying the factors that significantly influence cost overruns and time delays.To rank causes of cost and schedule overrun based on their frequency index, severity index ad importance index.To check accuracy of collected data using statistical method. Implementation of EVM method to check performance of the project.To assess which causes need the most attention by stakeholders.
"Analysis of Cost & Schedule Overrun in Construction Projects", IJSDR - International Journal of Scientific Development and Research (www.IJSDR.org), ISSN:2455-2631, Vol.3, Issue 5, page no.751 - 753, May-2018, Available :https://ijsdr.org/papers/IJSDR1805115.pdf
Volume 3
Issue 5,
May-2018
Pages : 751 - 753
Paper Reg. ID: IJSDR_180358
Published Paper Id: IJSDR1805115
Downloads: 000347333
Research Area: Engineering
Country: -, -, --
ISSN: 2455-2631 | IMPACT FACTOR: 9.15 Calculated By Google Scholar | ESTD YEAR: 2016
An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 9.15 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator
Publisher: IJSDR(IJ Publication) Janvi Wave