IJSDR
IJSDR
INTERNATIONAL JOURNAL OF SCIENTIFIC DEVELOPMENT AND RESEARCH
International Peer Reviewed & Refereed Journals, Open Access Journal
ISSN Approved Journal No: 2455-2631 | Impact factor: 8.15 | ESTD Year: 2016
open access , Peer-reviewed, and Refereed Journals, Impact factor 8.15

Issue: April 2024

Volume 9 | Issue 4

Impact factor: 8.15

Click Here For more Info

Imp Links for Author
Imp Links for Reviewer
Research Area
Subscribe IJSDR
Visitor Counter

Copyright Infringement Claims
Indexing Partner
Published Paper Details
Paper Title: Productivity improvements in furniture manufacturing industry by using kaizen
Authors Name: Kishor B.Ladi , Dr.A.P.Kedar , Pooja B.Bijwal , Milind M.Urkudkar
Unique Id: IJSDR1604042
Published In: Volume 1 Issue 4, April-2016
Abstract: The objective of this study is to understand and improve the productivity by applying kaizen methodology in the industry. Kaizen is a continuous improvement cycle which includes various techniques. Kaizen is an ongoing improvement involving everyone, including both managers and workers. Kaizen implementation and other continuous improvement practices can be used by companies to lower manufacturing costs and increase productivity. Kaizen activities are one way that companies can increase their effectiveness. In a manufacturing industry, the plant layout and material flow in the shop floor also plays a key role in influencing productivity through distance and time. Research work has been carried out to evaluate the designed plant layout. Initially, production process was analyzed through time study. Preliminary survey showed that in the existing layout travelling distance was time-consuming. Efforts were made in new plant layout to reduce the time and distance between subsequent processes. The study initiated by evaluating and identifying the problems occurred in the industry, continued by data collection. Study, process analysis and plant layout design, simulation were used as technique to improve the process. The plant layout is modified by using kaizen methodology. The new layout result was compared with existing layout result and shows an improvement of 15% productivity. The distance of the production flow can be shortened from 103.2 m to about 68.5 m. The production time can be reduced from about 48 min to 41.67 min. Results were also obtained through simulations.
Keywords: Keywords - Cycle Time, Kaizen, Layout design, Productivity, Simulation
Cite Article: "Productivity improvements in furniture manufacturing industry by using kaizen", International Journal of Science & Engineering Development Research (www.ijsdr.org), ISSN:2455-2631, Vol.1, Issue 4, page no.261 - 266, April-2016, Available :http://www.ijsdr.org/papers/IJSDR1604042.pdf
Downloads: 000337075
Publication Details: Published Paper ID: IJSDR1604042
Registration ID:160155
Published In: Volume 1 Issue 4, April-2016
DOI (Digital Object Identifier):
Page No: 261 - 266
Publisher: IJSDR | www.ijsdr.org
ISSN Number: 2455-2631

Click Here to Download This Article

Article Preview

Click here for Article Preview







Major Indexing from www.ijsdr.org
Google Scholar ResearcherID Thomson Reuters Mendeley : reference manager Academia.edu
arXiv.org : cornell university library Research Gate CiteSeerX DOAJ : Directory of Open Access Journals
DRJI Index Copernicus International Scribd DocStoc

Track Paper
Important Links
Conference Proposal
ISSN
DOI (A digital object identifier)


Providing A digital object identifier by DOI
How to GET DOI and Hard Copy Related
Open Access License Policy
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License
Creative Commons License
This material is Open Knowledge
This material is Open Data
This material is Open Content
Social Media
IJSDR

Indexing Partner