IJSDR
IJSDR
INTERNATIONAL JOURNAL OF SCIENTIFIC DEVELOPMENT AND RESEARCH
International Peer Reviewed & Refereed Journals, Open Access Journal
ISSN Approved Journal No: 2455-2631 | Impact factor: 8.15 | ESTD Year: 2016
open access , Peer-reviewed, and Refereed Journals, Impact factor 8.15

Issue: April 2024

Volume 9 | Issue 4

Impact factor: 8.15

Click Here For more Info

Imp Links for Author
Imp Links for Reviewer
Research Area
Subscribe IJSDR
Visitor Counter

Copyright Infringement Claims
Indexing Partner
Published Paper Details
Paper Title: STRATEGIC ON PLANNING OF BUILDING INFORMATION MODELLING IN MALAYSIA
Authors Name: Gunalaan Vasudevan
Unique Id: IJSDR1607025
Published In: Volume 1 Issue 7, July-2016
Abstract: Building Information Modeling (BIM) is currently being used by the architecture, engineering and construction (AEC) industry in Malaysia. It has been introduced by the Director of Public Works Department (PWD) in 2007 to enhance performances and quality in planning, design, construction, operation and maintenance stage. The main aim of this research is to study the implementation of BIM in Malaysian construction industry. A literature review was done to explore previous BIM studies on definitions of BIM, necessity of BIM implementation, concept and application of BIM, BIM tools, differences between traditional and BIM method, benefits of BIM, challenges in implementing BIM as well as ways to improve BIM implementation. The data came from various sources such as books, journal, articles and material available on the internet which related to BIM. Furthermore, questionnaire survey had been carried out where 100 sets of questionnaire were sent out to the developer, consultant, contractor, architectural and engineering companies as well as government sector in Malaysia and 55 sets completed forms received back were analyzed. Findings of the study revealed that the rate of BIM implementation in construction industry is very low. Major benefits of BIM are clash detection, accurate quantity take off as well as efficient project delivery process. However, major challenges to low level of BIM implementation are high cost of implementation, lack of training and lack of expert. Provide training program, include BIM course in higher education teaching syllabus and acquirement of new skills by staffs are very effective ways in enhancing the implementation of BIM.
Keywords: Building Information Modeling (BIM), Strategic Planning, Cost of implementation, and benefits of BIM
Cite Article: "STRATEGIC ON PLANNING OF BUILDING INFORMATION MODELLING IN MALAYSIA", International Journal of Science & Engineering Development Research (www.ijsdr.org), ISSN:2455-2631, Vol.1, Issue 7, page no.151 - 157, July-2016, Available :http://www.ijsdr.org/papers/IJSDR1607025.pdf
Downloads: 000337067
Publication Details: Published Paper ID: IJSDR1607025
Registration ID:160592
Published In: Volume 1 Issue 7, July-2016
DOI (Digital Object Identifier):
Page No: 151 - 157
Publisher: IJSDR | www.ijsdr.org
ISSN Number: 2455-2631

Click Here to Download This Article

Article Preview

Click here for Article Preview







Major Indexing from www.ijsdr.org
Google Scholar ResearcherID Thomson Reuters Mendeley : reference manager Academia.edu
arXiv.org : cornell university library Research Gate CiteSeerX DOAJ : Directory of Open Access Journals
DRJI Index Copernicus International Scribd DocStoc

Track Paper
Important Links
Conference Proposal
ISSN
DOI (A digital object identifier)


Providing A digital object identifier by DOI
How to GET DOI and Hard Copy Related
Open Access License Policy
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License
Creative Commons License
This material is Open Knowledge
This material is Open Data
This material is Open Content
Social Media
IJSDR

Indexing Partner