INTERNATIONAL JOURNAL OF SCIENTIFIC DEVELOPMENT AND RESEARCH International Peer Reviewed & Refereed Journals, Open Access Journal ISSN Approved Journal No: 2455-2631 | Impact factor: 8.15 | ESTD Year: 2016
open access , Peer-reviewed, and Refereed Journals, Impact factor 8.15
DEVELOPMENT OF PROJECT MANAGEMENT MATURITY MODEL FOR MEASURING SUCCESS OF CONSTRUCTION PROJECTS IN SURAT CITY
Authors Name:
Patel Dhruv R
, Neeraj D. Sharma , Rushabh A. Shah
Unique Id:
IJSDR1605030
Published In:
Volume 1 Issue 5, May-2016
Abstract:
Practitioners and academics have developed numerous maturity models for many domains in order to measure competency. These initiatives have often been influenced by the Capability Maturity Model. However, an accumulative effort has not been made to generalize the phases of developing a maturity model in any domain. From site survey, observation was made that there are many projects which have been done in Surat using standard tools of Construction Management but still they are not achieving the Benchmark level for which they have been designed so I came to conclusion of developing Maturity Assessment Frame for Surat City in Gujarat region. The aim of this study is to develop a framework to assess “Maturity Level of Construction projects” for Surat city. Total 10 main dimensions were collected from Literature review and site interview and with the help of Pilot survey new 4 dimensions were added and questionnaire was drafted for all 14 dimensions based on the practices followed on construction sites. Qualitative stakeholders like Owner, Site Engineer, Architects, Project Management Consultants, Project Manager and Contractors and from their reviews by using Rank Sum Method, Probability Method and Statistical Tools the analysis was done and Maturity Assessment framework of 5 level was developed for Surat city of Gujarat region. It was developed by questionnaire survey and 149 participators gave response out of 183. If this developed model is applied on construction site we can get to know how much mature is the construction site and practices are well described in questionnaire so by following it construction site can be made matured.
Keywords:
Construction Management, Maturity model, benefits, Graphical representation
Cite Article:
"DEVELOPMENT OF PROJECT MANAGEMENT MATURITY MODEL FOR MEASURING SUCCESS OF CONSTRUCTION PROJECTS IN SURAT CITY", International Journal of Science & Engineering Development Research (www.ijsdr.org), ISSN:2455-2631, Vol.1, Issue 5, page no.149 - 152, May-2016, Available :http://www.ijsdr.org/papers/IJSDR1605030.pdf
Downloads:
000336258
Publication Details:
Published Paper ID: IJSDR1605030
Registration ID:160292
Published In: Volume 1 Issue 5, May-2016
DOI (Digital Object Identifier):
Page No: 149 - 152
Publisher: IJSDR | www.ijsdr.org
ISSN Number: 2455-2631
Facebook Twitter Instagram LinkedIn